Difference between revisions of "Planning Application Documentation"

From Securipedia
Jump to navigation Jump to search
m
Line 1: Line 1:
 
={{PAGENAME}}=
 
={{PAGENAME}}=
  +
[[File:ae.png|25px|right|This is a page providing background in a specific field of expertise]]
 
'''Planning Application Documentation''' is the documentation to be submitted as part of a planning application.
 
'''Planning Application Documentation''' is the documentation to be submitted as part of a planning application.
   

Revision as of 13:14, 2 January 2013

Planning Application Documentation

This is a page providing background in a specific field of expertise

Planning Application Documentation is the documentation to be submitted as part of a planning application.

Description

The documentation to be submitted as part of a planning application will invariably be dictated by the scale and complexity of the proposed development, which could vary from a single residential unit to a regeneration quarter in a city centre consisting of a mixed-used development (shopping centres, apartments, office space, recreational facilities etc).

For a small scheme such as a single dwelling, the following documentation could be expected: Completed Application Form, Correct Fee, Public Notice, Site Location Map, Plans/Drawings (Layout, Sections, Elevations, Contiguous Elevations), Planning Supporting Statement (e.g. setting out compliance with the City Development Plan and land use zoning)

An example of a larger scale proposal would be a planning application for a national hospital in a city centre location. For such a development, the following documentation might typically be submitted (as part of the planning application):

  • Cover letter and Planning Fee, Site and Public Notices
  • Planning Reports
Planning Application Form, Schedules of Drawings, Planning Policy and Context Report, Architectural Design Statement, Site Masterplan, Landscape Report, Consultation Process Report, Economic Impact Assessment, Engineering Services Report, Impact Assessment of Construction Phase
  • Environmental Impact Assessment
Non Technical Summary, Chapters on: Scoping, Project Description, Alternatives, Human Beings, Flora and Fauna, Soils and Hydrology, Air, Climate and Microclimate, Noise and Vibration, Landscape and Visual Impact Assessment, Material Assets, Traffic and Transportation Impact Assessment, Architectural Cultural Heritage, Archaeological Cultural Heritage, Interactions
  • 3D Views
Cover Sheet with Key, Views from local environs (existing and existing with proposed scheme superimposed), Aerial views (block plan analysis), 3D Model Photographs
  • Architectural Drawings
Site Location Map, Site Ownership Map, Demolition Plan, Site Layout Plan, Floor Plans, Roof Plans, Elevations, Car Parking, Service Yards, Site and Building Sections, Transportation Plans, Protected Structure Plans
  • Landscape Drawings
Landscape Plan, Specific Pocket Park/Green Space Plans, Roof-garden plans (as appropriate), Entrance Plan, Landscape Section, Landscape specifications details
  • Engineering Drawings
Site Layout Transportation Analysis, Road Cross Section Drawings, Tactile Paving and Traffic Duct Manhole Plans, Pedestrian Crossing Points, Drainage Details, Constructions Details, Block Plan (Engineering Aspects), Mechanical and Electrical Services

MAP

<websiteFrame> website=http://securipedia.eu/cool/index.php?wiki=securipedia.eu&concept=Planning_application_documentation height=1023 width=100% border=0 scroll=auto align=middle </websiteFrame> <headertabs/>